Est. 1979 Structural EngineeringPrecast DesignParking Consulting

Call (651) 292-1123

Services

Parking Consulting Services

Reigstad brings 47 years of structural expertise to parking facilities of every scale and complexity.

Parking Consulting Rooted in Structural Depth

Parking consulting from Reigstad Engineers, Inc. covers the full structural scope of parking facility design, from initial feasibility through construction documents, for owners, architects, and developers working on new structures and renovation projects across the country. Gordon Reigstad, PhD, PE, SE, founded the firm in 1979, and parking structures have been part of the practice ever since. If your project needs an engineer who's worked through tight schedules, complex phasing, and demanding owners on structures like the Potawatomi Casino Hotel Parking Garage or the Epic Systems campus garage, call (651) 292-1123.

What separates good parking structure work from adequate work is usually the early thinking: how loads are distributed across a long-span system, what precast or cast-in-place approach fits the site and schedule, how expansion joints and drainage are detailed so the deck doesn't deteriorate in ten years. Reigstad's structural engineering background informs every parking engagement. The consulting isn't separate from the engineering, it's the same discipline applied upstream. Cost drivers on parking projects include span length, number of levels, site constraints, foundation conditions, and whether the structure is freestanding or podium-integrated. Every project is different. Contact Reigstad Engineers for an accurate estimate.

What a Parking Consultant Does

  • Evaluates structural systems, precast, cast-in-place, post-tensioned, for the specific site and program
  • Coordinates with architects and civil engineers from schematic design through construction
  • Sizes framing, connections, and foundations for the actual load conditions
  • Reviews contractor submittals and RFIs during construction
  • Addresses renovation, restoration, and expansion of existing parking structures

Project Types

Parking Structures Reigstad Has Engineered

Experience spans casino resorts, medical campuses, corporate headquarters, and mixed-use developments.

Casino and Resort Parking

Seminole Hard Rock Hotel and Casino garages in Hollywood and Tampa, Florida. Harrah's Cherokee Parking Garages in Cherokee, North Carolina. Potawatomi Casino Hotel Parking Garage in Milwaukee, Wisconsin. Island View West Parking Garage in Gulfport, Mississippi. High-volume, high-visibility structures built to demanding schedules.

Medical and Healthcare

Park Nicollet Methodist Hospital Orange Garage in St. Louis Park, Minnesota. Edina Crosstown Medical Specialty Center Parking Garage in Edina, Minnesota. Healthcare parking demands careful coordination with occupied facility operations and phased construction.

Corporate Campus

Epic Systems Parking Garage in Verona, Wisconsin. Large-scale campus parking requires integration with site circulation, long-span framing efficiency, and architecture that fits the owner's brand standards.

Mixed-Use and Urban

City Vue Parking Garages in Eagan, Minnesota. RiverCentre Parking Garage in St. Paul, Minnesota. Urban and mixed-use structures carry podium loads, tight site constraints, and the need to coordinate parking below occupied floors above.

How It Works

From Concept to Construction

Structural System Selection

Reigstad evaluates precast, post-tensioned, and cast-in-place options against the project's span requirements, site access, schedule, and budget. The right system is selected before schematic design locks in.

Design and Documentation

Structural drawings and specifications are developed in coordination with the architect and civil engineer. Reigstad's precast design depth and structural steel experience inform connection details that hold up in the field.

Construction Phase Support

Submittal review, RFI response, and site observation keep the structure on track. Reigstad stays engaged through the work, not just through the drawings.

47 Years of Parking Structure Work

Reigstad Engineers has been engineering parking structures since 1979. That's not a marketing figure. It's the difference between an engineer who's seen a deck system fail in winter conditions and one who hasn't. Gordon Reigstad, PhD, PE, SE, has been on-site for projects running on demanding schedules with real construction problems, and that field exposure shapes the design decisions made long before a shovel hits the ground. The firm is licensed in Minnesota and Mississippi and has completed parking consulting and structural work on projects throughout the United States. We don't hand parking structures off to junior staff. The expertise the client is hiring for is the expertise that works the project.

The Reigstad Standard on Parking Projects

What clients can count on from a Reigstad parking engagement.

Licensed PE and SE involvement
Gordon Reigstad, PhD, PE, SE, licensed in MN and MS
National project experience
Casino resorts, hospitals, campuses, urban mixed-use
Structural system expertise
Precast, post-tensioned, cast-in-place, the right choice for the site
Active construction-phase engagement
Submittal review and field observation, not just stamped drawings

Parking Consulting Questions

What does a parking consultant do on a structural engineering project?
A parking consulting engineer evaluates structural systems, sizes framing and foundations for actual load conditions, coordinates with the project architect, and produces construction documents the contractor can build from. At Reigstad, that work also includes construction-phase services: submittal review, RFI response, and site observation to confirm the structure is built as designed.
What structural systems are typically used in parking garages?
The three common options are precast concrete, post-tensioned cast-in-place concrete, and structural steel with a concrete deck. Precast is fast to erect and works well on larger freestanding structures. Post-tensioned cast-in-place suits tighter sites and podium conditions. The right choice depends on span requirements, site access, schedule, and foundation conditions, not on a preferred system.
How does renovation or restoration work differ from new parking structure design?
Existing structures carry decades of load history, deferred maintenance, and deterioration that new construction doesn't. Restoration requires investigation first, cores, chloride testing, structural assessment, before any repair scope can be defined. Reigstad has done this work on projects like the RiverCentre Parking Garage restoration, where the existing structure has to stay functional while the work proceeds.
What drives cost on a parking structure project?
Span length is the primary structural cost driver: longer spans require heavier framing and more material. Number of levels, foundation conditions, site access for precast delivery, and whether the garage is freestanding or integrated into a larger building all move the number. Every project is different. Contact Reigstad Engineers for an accurate estimate.
Does Reigstad work on casino and resort parking projects specifically?
Yes. The firm has completed parking structures for Seminole Hard Rock Hotel and Casino in Hollywood and Tampa, Florida, Harrah's Cherokee in North Carolina, Potawatomi Casino Hotel in Milwaukee, and Island View Casino in Gulfport, Mississippi. Casino resort garages typically involve high vehicle throughput, demanding owner schedules, and coordination with occupied resort operations during construction.
How is a structural parking consultant different from a traffic or operations parking consultant?
A structural parking consultant is an engineer focused on how the building stands up: the framing system, the connections, the foundations, the deck waterproofing details. Traffic and operations consultants address how cars move through the facility. Reigstad's scope is structural, the construction inspection services and engineering deliverables that make the structure safe, durable, and buildable.
How does parking structure renovation differ from new construction?
Existing structures carry decades of load history, deferred maintenance, and deterioration that new construction doesn't. Restoration requires structural investigation first, cores, chloride testing, condition assessment, before any repair scope can be defined. Reigstad has completed this work on projects like the RiverCentre Parking Garage restoration in Saint Paul.
Does Reigstad work on casino and resort parking projects?
Yes. The firm has completed parking structures for Seminole Hard Rock Hotel and Casino in Hollywood and Tampa, Florida, Harrah's Cherokee in North Carolina, Potawatomi Casino Hotel in Milwaukee, and Island View Casino in Gulfport, Mississippi. Casino resort garages typically involve high vehicle throughput, demanding owner schedules, and coordination with occupied resort operations during construction.

Contact

Start a Conversation About Your Parking Project

Reigstad Engineers has engineered parking structures for casino resorts, medical centers, corporate campuses, and urban mixed-use developments since 1979.

St. Paul / Minneapolis (651) 292-1123 Reigstad Engineers, Inc. 192 West 9th Street, St. Paul, MN 55102 Directions

Or write to info@reigstad.com

Project inquiry

Tell us about your project

Discipline Optional

By submitting this form you agree that we may contact you about your request. We do not sell, rent or share your information with third parties or affiliates for marketing or promotional purposes.

Updated November 2026